Site update – Operations pages updated

I’ve completed a complete rewrite of the introduction page to the operations section. In addition I’ve added another page to the ops section to improve the information flow. I wrote the original in September 2014 stating that it would be a living document, and so it has proved.

You can read the updated intro page here. That page then refers you to the new 101 – Ops Intro page which has more information on the subject moved on from the first page. I’ve updated several of the other pages also. There is still more work to do to make a better complete article. I’ll continue working on this section during January and February 2018. More information once I complete the new sections.

I don’t expect that you will agree with me on every point in this article series on Operations. For me it is about creating the conversation, and getting people to talk and think about the subject. I hope that you will use it as a jumping off point from which to refine your own vision of what model railroad operations means for you.

Make sure to comment and share your ideas with me. I love hearing what you have to say.

Site update – Tram pictures update – A2 Class edition

I’ve updated the Melbourne A2 class page with additional photos of the Southbank assigned units.

I’ll continue to update photos as I find or take them.

Site update – Tram pictures update – A1 Class edition

I’ve finished uploading and documenting all of my recent Melbourne A1 class tram photos. You can see the page here: https://wp.me/P47pPY-hi

All the photos are of Southbank trams (with some exceptions where I’ve not driven them). There are some Glenhuntly A1 class trams that I’ve not managed to get photos of – yet.

Keep coming back as I’ll be updating photos as I can get them. And I have a bunch that I’ve yet to get on the website. They’ll continue to come up as I can get the time to upload and write them up.

 

Site Seeing – January 1 – The new Everard Junction version

Everard Junction was a great finished model railway filling the loft of Richard Warren’s home in the UK (his YouTube channel can be watched here). However, he was unhappy with several key elements to the underlying baseboard design and issues with the loft space itself  that were causing running issues due to temperature and moisture. So he took what I consider to be a brave step and decided to start again from scratch.

With the loft area now completely reworked, insulated and ready to go, the work to build the new Everard Junction (Mark II?) is underway. As I write there are four videos in the current build series with more to come. With much detail each shows what ideas and issues Richard is solving as he builds the new layout. Richard’s baseboard design shows the very serious thought he has put into the new build. A couple of his ideas will make it into my next baseboard design, specifically allowing a removable backscene within the body of the baseboard.

Click the videos below to being watching, and if you find them interesting head over to the YouTube channel and like and subscribe. There’ll be more content about the build shortly and Richard is very good at presenting his ideas and showing his working method. Now onto the videos.

Videos

New Layout Build – Baseboards

Layout Update – November 2017

New Layout Build – Backscenes

New Layout Build – Fiddle Yard

There are a heap of videos on his channel that should be watched for their ideas and his modelling is outstanding. Enjoy Richard’s work; I do.