Wanted to share some photos of the new layout build. I’ve been preparing, and where I needed to, buying wiring materials to complete the major wiring. More…


The layout – as built

Here are some more images of the layout build as it stands at the moment. You’ll note that the layout is freestanding, resting on trestles (hand built with simple woodworking tools in my garage – more on that later in another post).

I’ve included the final trackplan; it’s important for me to point out that you can plan forever on screen, but while ever you don’t take the plan to the baseboard I really cannot see what I have and what I need to do to make the layout visually appealing (well at least that’s how it is for me).


Track laying

When I begin to lay out the track I print out the track plan, and using a grid marked out on the plan and layout board, begin to match up the plan to the layout.

Then I mark up the top of the layout surface (in this case 2″ blue foam) using a pencil to mark the outside of the ties. This enables me to positively place the cork where I need it to be once the track is removed, drill holes for feeds and frogs, and although not shown in these photos mark out the sub-terrain ‘rod in tube’ locations from the tie bar to the front fascia of the layout.

These markings allow me to dig out the foam before installing the cork, drill the holes in the fascia and install the tubes in place using hot glue. There’ll be a post on that too in the not too distant future for those that may not know about this switch operating method.

 


Wrap up

That’s it for this post.

I’m finding that time to write posts is really short at the moment – work is an all consuming animal as we live 120 Km from where I work – so I’m adding 4 travel hours a day to what is an already 9-10 hour day. Looking forward to moving back into Melbourne later in the year which will give me a lot of time back in my life.

I have three weeks of holiday coming up in 1 week batches over the next 6 weeks – looking forward to that and to getting more photos and posts out to you all.

Next week I’ll be working broken shifts and will be working on posts covering these topics:

  1. Layout Build Part 3 post on building Trestles,
  2. Track laying,
  3. Switching infrastructure (rod in tube), and
  4. Wiring.

I hope that you’ll ask any questions that you have either here through the comments, or on the facebook page.


Resources

Interested in keeping in touch or discussing posts, pages and ideas? Connect with us on the

Andrew’s Trains page on Facebook

Advertisements

About Andrew Martin

After a long IT and Telecommunications career in the USA and Australia, I've decided I need a break, I've changed focus and now work in the public transport sector - a complete change of pace. Hobby wise I'm focused on model railway layout building and modelling. I blog, write and publish as often as I am able.
This entry was posted in Layout Design, Modelling, Site Updates, Small, Switching, This Site and tagged , , , . Bookmark the permalink.

2 Responses to Evans Hollow Industrial build: Quick Update – 08 August 2019

  1. Charles Malinowski says:

    A great update! Perfect for my morning coffee break a the the office.
    Q: A what point do you plan on painting the Blue Foam? Prior to track laying?

    • A: Once I have the cork laid down, the tube (for the rod in tube method) inset in the foam, and the wiring in place 9but track not laid on the cork, then I’ll be painting the land foam form. There’ll be more than just the flat that you see at the moment. I’m still working on this idea at the moment – one step at a time.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.