Evans Hollow Industrial Build: Quick Update – 05 October 2019

20191005_182435

The brass rod has yet to be drilled through the layout edge. Aiming to get that done this weekend Then the wire can be inserted into the tube and mounted to switch in preparation for the dpdt switched to be mounted.

Advertisements
Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.