Tag Archives: build

Evans Hollow Industrial Build – Part 3: Holding the whole thing up with Trestles

In part 2 of this series we looked at the baseboard design. Covering the the issues I’d found and the solutions I’d come up with to work around them using a Hollow-Core Door (HCD) as a baseboard. This time we’ll … Continue reading

Posted in Layout Design, Layouts, Modelling, Site Updates, Small, Switching, This Site, Updates | Tagged , , , , , , , , , , | 1 Comment

Why I chose not to design my layout – part 1

Introduction I’ve designed a lot of layouts over the years, because I wanted to and because I got paid to. With my new layout though I wanted to take a more organic approach, one that relied less on the ruler … Continue reading

Posted in Home, Layout Design, Layouts, Operations, Switching | Tagged , , , | Leave a comment